Crusoe

Crusoe is a US AI infrastructure company that describes itself as vertically integrated: it sources energy, builds and manages AI data centers it calls “AI factories”, and sells computing through its own platform, Crusoe Cloud.1 Its company timeline says it was founded in 2018 with technology to convert wasted natural gas into power for high-performance computing, made Crusoe Cloud generally available in 2024, and in 2025 sold its bitcoin mining business to NYDIG to focus only on AI infrastructure.1 It says it has over 40 GW of energy projects in development.2

Its flagship build is the Abilene, Texas campus it develops for Oracle, the first Stargate site. Crusoe says construction began in June 2024, the first two buildings were energized within a year, and the first phase was running on Oracle Cloud Infrastructure by September 30, 2025.3 Oracle’s 2025 fact sheet names Crusoe as the site’s development partner.4 Epoch AI estimates that the four operational buildings have 421 MW of IT power, or 590 MW including cooling and other overhead, which ranks the campus seventh in Largest AI Data Centers by Estimated Power Draw (October 2026).56 Epoch projects all eight buildings running around November 1, 2026; Crusoe’s own March 2026 target for the 1.2 GW campus was the end of 2026, a schedule Stargate's Sites: Operating vs Under Construction vs Planned follows.67 The same March release announced a separate 900 MW campus next door to support Microsoft: two buildings designed for 336 MW of critical IT load each, with an on-site power plant, the first expected to be energized in mid-2027, taking the whole Abilene site to a projected 2.1 GW.7 Crusoe is also the developer of Google’s campus in Armstrong County, Texas, where it says construction broke ground in June 2025.8

Illustration: Crusoe sits in the data-center and energy layer of the stack, as the developer of Stargate’s first campus.

Key facts

Founded20181
BusinessEnergy development, AI data centers and the Crusoe Cloud platform1
Stargate Abilene, first phaseTwo 100 MW buildings energized in under one year Vendor-stated7
Stargate Abilene, operating nowOperational Buildings 1–4: 421 MW IT, 590 MW facility Estimate6
Stargate Abilene, full campusUnder construction 8 buildings, 1.2 GW, completion expected by end of 2026 Vendor-stated7
Abilene campus for MicrosoftUnder construction 900 MW; 2 buildings of 336 MW critical IT each; first energized mid-2027 (expected) Vendor-stated7
Energy projects in developmentOver 40 GW Vendor-stated2
Google campus, Armstrong County, TexasDeveloper; ground broken June 20258

As of . Operating figures are Epoch AI estimates (CC BY 4.0, dataset updated Oct 12, 2026); capacity targets are Crusoe’s own. How figures are labeled.

Appears in

Sources

  1. Crusoe, Company (company timeline), retrieved 2026-10-13.
  2. Crusoe, Energy, retrieved 2026-10-13.
  3. Crusoe, Crusoe announces flagship Abilene data center is live, Sep 30, 2025, retrieved 2026-10-13.
  4. Oracle, Oracle Fact Sheet: Stargate Data Centers, Sep 23, 2025 (copy hosted by the office of Rep. Jodey Arrington; oracle.com was not reachable), retrieved 2026-10-13.
  5. Epoch AI, OpenAI Stargate Abilene (AI data centers directory entry, updated Oct 12, 2026; CC BY 4.0), retrieved 2026-10-13.
  6. Epoch AI, AI data center timelines CSV (dated IT power, total power, buildings operational and construction notes; updated Oct 12, 2026; CC BY 4.0), retrieved 2026-10-13.
  7. Crusoe, Crusoe Announces New 900 MW AI Factory Campus in Abilene, Texas to Support Microsoft AI Infrastructure, Mar 27, 2026, retrieved 2026-10-13.
  8. Crusoe, Crusoe Develops Google AI Data Center Campus in Armstrong County, TX, retrieved 2026-10-13.